The Future Homes Standard Is Coming in 2027: Why Timing Matters for Your Project
6 October 2026
The government published the Future Homes Standard on 24 March 2026. It brings in updated building regulations for energy efficiency and ventilation, and for most building work it comes into force on 24 March 2027. If you’re planning an extension, loft conversion or renovation over the next year or so, it’s worth understanding how the timing works.
What the Future Homes Standard is
The Future Homes Standard updates Part L (conservation of fuel and power) and Part F (ventilation) of the building regulations in England. Most of the headline changes are aimed at new homes, which will need to produce far lower carbon emissions than homes built to current standards, typically through measures like heat pumps, solar panels and better insulation and airtightness.
The updated regulations apply to both domestic and non-domestic buildings, and the new guidance places a strong emphasis on properly commissioning heating, hot water and ventilation systems in both new and existing homes. Exactly how the changes affect a specific project, such as an extension or loft conversion, depends on the work involved, so it’s something to check for your own scheme rather than assume.
The key dates
For most building work (anything that isn’t a higher-risk building), the dates to know are:
- 24 March 2027: the new regulations come into force.
- Transitional arrangements: projects can continue under the current regulations if the relevant documents, such as a full plans application or building notice, are submitted before 24 March 2027 and work starts on site by 24 March 2028.
Higher-risk buildings follow a separate timetable, but that won’t apply to most homeowners.
Why this matters if you’re planning work
If your project is likely to start in the next 12 to 18 months, the timing of your building regulations submission could make a difference to which set of rules applies. Getting your drawings prepared and submitted in good time gives you more certainty, whichever way you go.
It’s also a reminder that a good design takes time. Between an initial survey, design development, any planning application and the detailed building regulations drawings, most projects need several months before they’re ready to build. Starting the design process early leaves room to make decisions without rushing.
Planning and building regulations are separate
Planning permission and building regulations approval are two different things. Even where a project doesn’t need planning permission, building regulations approval is almost always needed for an extension or loft conversion. The Future Homes Standard affects the building regulations side.
How we can help
We take projects from concept through to construction-ready drawings, including the detailed technical drawings needed for building regulations approval. If you’re weighing up when to start, we can talk through a realistic timeline for your project.
Get in touch to discuss your plans, or read more about our building regulations drawings.
This article is general information only and isn’t legal or technical advice. Requirements depend on your property and the work proposed.