Planning Permission vs Building Regulations: What's the Difference?

If you’re planning an extension, a loft conversion or a shop fit-out, you’ll hear two phrases again and again: planning permission and building regulations. They’re easy to confuse, and a lot of people assume that getting one means they’ve got the other.

They’re not the same thing. Most projects need at least one of them, and many need both.

The short version

  • Planning permission is about what you build and whether it’s acceptable where it is. How it looks, how big it is, and how it affects your neighbours and the area.
  • Building regulations are about how it’s built. Whether it’s structurally sound, safe in a fire, energy efficient and accessible.

One is about the impact on the street. The other is about the safety of the building.

Planning permission

Planning permission comes from your local council’s planning department. When they look at an application, they’re asking questions like:

  • Is the size and design appropriate for the house and the street?
  • Will it overshadow or overlook the neighbours?
  • Does it affect a conservation area or a listed building?
  • Does it fit the council’s local planning policies?

Not every project needs a full planning application. Many smaller extensions and loft conversions on houses can go ahead under permitted development rights, a set of national rules that allow certain work within set limits. Those rights can be restricted, though, for example in conservation areas or where the council has made an Article 4 direction.

If you want a quick first look at whether your property has any planning constraints, our Project Checker will check your address against national planning data.

Building regulations

Building regulations are national minimum standards for how building work is designed and carried out. They cover things like:

  • Structure — foundations, walls, beams and floors
  • Fire safety — escape routes, fire doors, smoke alarms
  • Energy efficiency — insulation, windows, heating
  • Ventilation and drainage
  • Access — stairs, headroom and door widths

Approval comes from building control. You can use your local council’s building control team, or a registered building control approver (a private-sector alternative).

There are usually two ways to apply:

  • Full plans. Detailed drawings are submitted and checked before work starts. This is the safer route for anything structural, because problems are caught on paper rather than on site.
  • Building notice. You give notice and work starts with inspections as it goes. It’s quicker to begin, but there’s no up-front check of the design, and it isn’t available for every type of project.

At the end, building control issues a completion certificate. Keep it. You’ll need it when you sell.

Which projects need which?

A rough guide, which always depends on the specific property and design:

Project Planning permission? Building regulations?
Single-storey rear extension Often not, if within permitted development Yes
Two-storey extension Usually Yes
Loft conversion Often not, if within permitted development Yes
Garage conversion Often not Usually
Internal wall removal (structural) No Yes
Change of use (e.g. shop to café) Usually Often
Commercial shop fit-out Depends on external changes and use Usually

The pattern to notice: building regulations apply far more often than planning permission does. Plenty of projects need no planning application at all but still need building control approval.

What happens if you get it wrong?

Starting work without the right approvals can cause real problems:

  • The council can take enforcement action over unauthorised development, which in the worst cases means altering or removing the work.
  • Work without building regulations sign-off can be required to be opened up or corrected.
  • When you sell, missing approvals tend to surface during the buyer’s searches and can delay or derail the sale.

It’s almost always cheaper and quicker to get the approvals right at the start.

How we help

We produce the drawings for both. That means planning drawings that show the council what you want to build and how it fits its surroundings, and building regulations drawings that show building control and your builder how it will be built safely. We take projects from first concept through to construction-ready drawings.

If you’re not sure which approvals your project needs, get in touch and tell us what you have in mind.